Share

7) Installation

7) Installation

Installation

The actual installation is an exciting day for every solar owner. Your solar installer will start by prepping your roof and making sure the structures are properly attached. Then, we put in electrical wiring that will connect to your electrical panel and general power system. After the electrical wiring is complete, we will install racking to support your panels. Once the racking is level and safely attached, the panels are placed onto the racking. Finally, your inverter(s) are connected to the panels to convert direct current (DC) energy into the alternating current (AC) energy used in your premises and on the electric grid.

The timeline for the installation will completely depend on the size of the system you are installing. One additional factor that can add time to your installation process is putting in a power meter for net metering.

Our Installation Methodology from Non-Penetrative to Elevated, Self-weight to Ballast.

Share post: